Startup 570: Difference between revisions
Jump to navigation
Jump to search
Created page with "Starting up the Frontier 570 #Make sure main breaker, located at bottom right of the sorter rack side, is flipped up. #Flip the power switch, located at top left of paper maga..." |
No edit summary |
||
| Line 5: | Line 5: | ||
#(Only complete this step if it is a Monday, Wednesday or Friday. If Tuesday or Thursday skip to step 5)Once each heater status reads OFF, check to make sure there are no prints on the sorter and that the rack conveyor is locked (see the switch on the side below the sorter.) Lift the sorter unit and load the control strip carrier into the gap in the first processor rack. Close the sorter unit. Click OK on the heater status window. Once the control stip is loaded, click OK on the control strip window. Look at the LCD screen and console on the 570. To begin control strip processing select "YES" and hit ENTER. Wait while the control strip is processed. | #(Only complete this step if it is a Monday, Wednesday or Friday. If Tuesday or Thursday skip to step 5)Once each heater status reads OFF, check to make sure there are no prints on the sorter and that the rack conveyor is locked (see the switch on the side below the sorter.) Lift the sorter unit and load the control strip carrier into the gap in the first processor rack. Close the sorter unit. Click OK on the heater status window. Once the control stip is loaded, click OK on the control strip window. Look at the LCD screen and console on the 570. To begin control strip processing select "YES" and hit ENTER. Wait while the control strip is processed. | ||
#Cancel out of control strip boxes until you reach main print screen "Panda". | #Cancel out of control strip boxes until you reach main print screen "Panda". | ||
#If condition prints have not been calibrated for the day, run the [[condition prints]]. | #If condition prints have not been calibrated for the day, run the [[condition prints 570]]. | ||
#To initiate printing of new orders activate smaller "Digital Link Request Spooler" adim window, and click the "Accept incoming orders" (magenta arrow pointing into green thing) and "Enable processing" (alternating green arrows) buttons. | #To initiate printing of new orders activate smaller "Digital Link Request Spooler" adim window, and click the "Accept incoming orders" (magenta arrow pointing into green thing) and "Enable processing" (alternating green arrows) buttons. | ||
Latest revision as of 18:10, 14 March 2013
Starting up the Frontier 570
- Make sure main breaker, located at bottom right of the sorter rack side, is flipped up.
- Flip the power switch, located at top left of paper magazine/densitometer side, to ON. Wait for LCD display to read "FRONTIER", then flip the power switch to STANDBY.
- Turn on the computer tower. Wait for software to boot up.
- (Only complete this step if it is a Monday, Wednesday or Friday. If Tuesday or Thursday skip to step 5)Once each heater status reads OFF, check to make sure there are no prints on the sorter and that the rack conveyor is locked (see the switch on the side below the sorter.) Lift the sorter unit and load the control strip carrier into the gap in the first processor rack. Close the sorter unit. Click OK on the heater status window. Once the control stip is loaded, click OK on the control strip window. Look at the LCD screen and console on the 570. To begin control strip processing select "YES" and hit ENTER. Wait while the control strip is processed.
- Cancel out of control strip boxes until you reach main print screen "Panda".
- If condition prints have not been calibrated for the day, run the condition prints 570.
- To initiate printing of new orders activate smaller "Digital Link Request Spooler" adim window, and click the "Accept incoming orders" (magenta arrow pointing into green thing) and "Enable processing" (alternating green arrows) buttons.